Meralco Panel Permit Inspection
Publicada el 2026-07-29
Descripción de la oferta
My residential service entrance panel is already installed and wired; what I now need is a licensed master electrician who can carry the process through to the local permit stage required by Meralco. Your primary role will be to inspect the finished work, confirm that it meets Philippine Electrical Code and Meralco standards, then sign-off and file the necessary permit paperwork with the city or municipality. Because the hardware is in place, no physical installation or modification is expected unless you discover a compliance issue during inspection. Should that happen, I would appreciate a quick estimate for the corrective work so we can keep the permit timeline on track. Please have an active PRC licence and Meralco accreditation, bring your own test instruments (multimeter, insulation tester, grounding tester) and be familiar with the current PEC edition as well as LGU procedures for Certificate of Final Electrical Inspection (CFEI). Deliverable: • Signed inspection report and all documents submitted to the local office so I can obtain power energization approval. If you are available for a site visit this week, let me know your earliest slot and the paperwork you will need from me beforehand.
Skills
Fuente original: freelancer